We offer everything for the complete implementation of a construction. We are able to react flexibly and implement any initiative from the customer. For a construction company, this is an essential condition in order to satisfy even the most demanding client and offer them a comprehensive package of services in the field of preparation and implementation of the construction.
We carry out the construction using the latest technological procedures with emphasis on the quality of the materials used.
Our company can provide a full range of construction activities in the construction or reconstruction of buildings. We are also able to provide you with individual professions, but we also act as a general contractor for smaller and larger scale constructions.
The timeless mindset of our construction company, which lies not only in the view of the construction itself, but also to a significant extent in the client orientation, makes it an ideal partner for the creation of buildings.
Our company can provide a full range of construction activities in the construction or reconstruction of buildings.
Stavby
Prestressed slab on the D3 motorway Svrčinovec-Skalité, SO 242-00 Bridge | D3 Motorway | 2015 | Doprastav, a.s. | 3,252 |
MO 59-090 Podbiel removal of bridge in disrepair assembly and disassembly of the bridge provision | Podbiel | 2015/2015 | Doprastav, a.s. | 1,184 |
Preparation and implementation of the construction of Nitra Strategic Park | Nitra | 2015/2017 | Strabag Pozemné a inžinierske staviteľstvo, s.r.o. | 31,009 |
Construction of the Nitra-HTU II strategic industrial park | Nitra | 2016/2017 | Strabag Pozemné a inžinierske staviteľstvo, s.r.o. | 19,654 |
Elimination of the emergency condition of the road I/65 Kremnica-Kremnicke Bane | Kremnické Bane | 2017/2019 | Združenie Metrostav, a.s. | 17,858 |
Flood control measures on streams | Lysický potok | 2016 | Municipality of Lysica | 89 |
Measure on the tributaries of the Handlovka-Jalovský brook | Cadastre of Brusno | 2017 | SVP, š.p. | 47 |
Reconstruction of the frame wall | Pohronská Polhora- Tisovec | 2016 | ŽSR | 109 |
Flood protection measure and stream regulation | Dlhé Pole | 2015/2016 | Municipality of Dlhé Pole | 220 |
Preparation of NITRA road infrastructure-strategic park Rehabilitation of gravel piles, rehabilitation of the subsoil, large roundabout | Združenie Doprastav, STRABAG | |||
D1 motorway Hričovské Podhradie-Lietavska Lúčka Manufacture, delivery and installation of concrete crash barriers SO 101-00 | D1 motorway | 2020/2021 | STRABAG s.r.o. | |
D1 motorway Hričovské Podhradie-Lietavska Lúčka Special foundation works-micropiles SO 234-00/1 Phstena | D1 motorway | 2020/2020 | STRABAG s.r.o. | |
D1 motorway Hričovské Podhradie-Lietavska Lúčka Production, transport and assembly of DPS type beams VP I/10 | D1 motorway | 2020/2020 | STRABAG s.r.o. | |
D1 motorway Hričovské Podhradie-Lietavska Lúčka Implementation of temporarily built-in sheet pile walls and spacer frames | D1 motorway | 2020/2020 | STRABAG s.r.o. | |
D1 motorway Hričovské Podhradie-Lietavska Lúčka Supply elastomeric bearings | D1 motorway | 2020/2020 | STRABAG s.r.o. | |
Preparation of the Nitra-MÚK Šindolka Strategic Park Remediation of gravel vibro-pipeline DN 0.55m including the incorporation of aggregate fraction 8-32mm | Nitra | 2020/2021 | SKATE s.r.o. | |
Preparation of the Nitra-MÚK Šindolka Strategic Park OK ST K1, MTS ST K1 relocation | Nitra | 2020/2021 | SKATE s.r.o. | |
Preparation of the Nitra-MÚK Šindolka Strategic Park Relocation of extrusion sewer DN 200, water pipeline DN 200 Reconstruction of low-voltage distribution lines, HV intersections, streets | Nitra | 2020/2021 | SKATE s.r.o. | |
SaarGummi Slovakia s.r.o. Delivery and replacement of plastic windows Supply and replacement of painted sheet metal | Dolné Vestenice | 2020/2021 | SaarGummi Slovakia s.r.o. |